Arktura . Shipped . 2025
Redesigning Arktura's Samples Store
I led the redesign of the Samples Store, using a Shopify template to turn a static page of diagrams into a streamlined, self-serve shopping journey.
- Timeline
- 4 Months
- Roles
- UI/UX DesignerResearcher
- Team
- 3 members
- Status
- Shipped

~80%
Of Sample orders automated in 3 months
~10 hrs/week
Sales team time saved
~30%
Fewer order errors


The problem
The Challenge: A checkout process that had outgrown its original design
The original store was little more than a static page of diagrams. It had no product photography, no categories and no ordering system.
Ordering meant calling the sales team. That added friction for architects, designers and reps, and it kept the sales team busy with work a store should handle.

Problems
Problems that users continued to encounter
Navigation
Products weren't categorized, so reps and designers couldn't find a specific sample.
What changed
Clear categories and grouping made product discovery quicker.
Product info
With only diagrams and no photography, customers couldn't judge the materials with confidence.
What changed
High-quality photography replaced the diagrams, so people could see what they were choosing.
Ordering
There was no cart or checkout, so reps had to call Sales to place each order.
What changed
A cart and checkout flow automated ordering and took load off the sales team.
Takeaway: the main advantage of this redesign was that it improved the usability of the site and saved the sales team time on manual work that could be automated, leaving them more time to focus on their sales clients.
Role and team
My role and team
I owned
- Redesign lead and UI/UX design
- Wireframes, then high-fidelity screens
- Design system and front-end implementation
Others owned
- Developers: checkout system and launch
- Photographer: product shoot
Constraints
Constraints
- Shopify template
- 4 months
- Photography budget
- Brand refresh
Decision
Bringing context into the conversation
- Insight
- Leadership questioned whether a redesign would pay off, since orders already worked by phone and email.
- What I did
- Built low-fidelity wireframes to show how a modern store would help before any budget was approved.
- Chosen
- Approval to go ahead with the redesign.
- Trade-off
- Some wireframe ideas changed once the template was chosen, so part of that work was redone.

Decision
Shopify template vs. Custom build
- Insight
- A custom build did not fit the four-month timeline, the budget (which also had to cover photography) or the developers' capacity, and a standard platform is easier to maintain.
- Chosen
- A Shopify template, customised to Arktura's brand and a visual design system.
- What it blocked
- The template limited layout flexibility, checkout customisation and some brand expression.
- Trade-off
- I gave up full control of layout and checkout in exchange for a design that could ship within four months.

Decision
Photography over diagrams
- Insight
- Customers couldn't judge the materials from diagrams alone.
- Chosen
- Budget for a photographer, and hundreds of sample images edited in Photoshop and Illustrator.
- Rejected
- Keeping the existing diagrams. They did not give customers enough detail to judge a material.


Solution
The solution, screen by screen


Accessibility: checkout forms have labels and error messages, CTAs and nav links were colour-tested for contrast, and product images have descriptive alt text.
Results
Results
~80%
of sample orders automated, first 3 months
Sales team estimate, first 3 months
~10 hrs/wk
staff time saved
Sales team estimate
~30%
fewer order errors
Sales team estimate
How I built it
How I built it
Timeline
- 1
Wireframes
Built to show the value of a redesign and secure leadership approval.
- 2
Photography
Hired a photographer and edited hundreds of sample images.
- 3
UI and template
Customised a Shopify template and built a visual design system.
- 4
Build and launch
Worked with developers across teams to build the checkout and launch.
Built with
Shopify, Figma, Photoshop, Illustrator
What went wrong
Editing hundreds of product photos took far longer than planned, and handoffs between the teams involved slowed the project down.
Where it stands
Where it stands and what I'd change
Where it stands
Live at samples.arktura.com. Most sample orders now go through self-serve checkout.
What I'd change
Test with real customers earlier, plan photography sooner, and involve the developers earlier.
What I'd measure first
How many orders still need the sales team's help.
